PROJECT
Establishing a Water Control and Operations Center in Baghdad
PROJECT CODE OTH-028
Longº Latº
Start: 2015
Duration: 3
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $39,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $39,000,000
Governorate: BAGHDAD
River: Tigris-Euphrates
Location: Baghdad, at the MoWR
Category: Others
Sub category: Facilities
Sector: Flood control;
Type: Improve Water Resources Management Practices
Opportunity type:
Source: MoWR
Source of fund: MoWR
Original source: PMO
Implementing agency: MoWR
Status:
Description
Needs
Construction of a Water Control Operation Center. It will be the depository for all real time reservoir level and flow data. The center is a physical structure, or room, with a state-of-the-art graphical display of the system and communications systems to each major hydraulic structure.
Objective
The Operations Center constantly monitors the status of the entire reservoir and river system and implements the regulation plan according to established operation plans and simulation model results. The facility becomes the Emergency Operations Center i