PROJECT
Development of Training Center
PROJECT CODE OTH-033
Longº Latº
Start: 2015
Duration: 3
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $665,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $665,000
Governorate: IRAQ
River: Tigris-Euphrates
Location: Nationwide
Category: Others
Sub category: Capacity Building
Sector: Domestic, rural, and industrial water supply and wastewater treatment, recycle and reuse of drainage and sewage water;
Type: Education or Capacity Building
Opportunity type:
Source:
Source of fund: MoWR
Original source: PMO
Implementing agency: MoWR
Status:
Description
Needs
Auditorium. The structural aspects of the auditorium have recently been repaired. However several different items are needed to get the auditorium functioning again. The auditorium seats around 220 people. A projection room is located in the balcony and needs to be epuipped with a projector and sound equipment. A large projection screen is located at the front of the auditorim and must be replaced. To fit these needs the Ministry will need: -Approximately 220 auditorium seats with pull out desk-tops (see attached) need to be purchased and installed. -16000 lumen projector, 1280×1024 Resolution -24×10 projector screen -surroud sound communications system: soundboard/mixer, speakers/PA, audio cables -multimedia computer with dual video cards -podium with microphone Computer Training Room. 40 high end computers capable of running GIS and Engineering software. 40 glass-top recessed computer workstations (see attached) 3500 lumen projector
Objective
The training gap between ministry employees and their counterparts in any other developed nation is immense. The Ministry is in great need of an in-house Training Center where employees can receive training by consultants or expert volunteers. Virtually
