PROJECT

Utilize existing Desilting Basin at Faluja Barrage

PROJECT CODE OTH-051

Long43.7725º Lat33.3087º

Start: 2015

Duration: 20

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $0
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $0

Governorate: ANBAR

River: Euphrates

Location:

Category: Others

Sub category: Sedimentation

Sector: Current and future water allocation for each irrigation project;

Type: Mantainance

Opportunity type: Construction

Source: MoWR

Source of fund: MoWR

Original source: SWLRI

Implementing agency: MoWR

Status:

Utilize existing Desilting Basin at Faluja Barrage

Description

Their is a desilting basin constructed with Faluja barrage at the head of the combined canal ,the combined canal supply a vast area of what is called Greater Abu-Ghreb project ,this large project is well developed ,but still facing some problem of silt deposit, Using the existing sedimentation basin in proper way (according to operation manual ) ,can greatly solve the issue of sedimentation in the ” Greater Abu-Ghraib project ”

Needs

Objective

Screening

Beneficiaries