PROJECT
Perform Preliminary and Detailed Design
PROJECT CODE OTH-055
Longº Latº
Start: 2015
Duration: 15
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $2,500,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $2,500,000,000
Governorate: IRAQ
River: Tigris-Euphrates
Location: Baghdad, at the MoWR
Category: Others
Sub category:
Sector: Other issues affecting water management and sustainable development (surface and ground water).
Type: Improve Water Resources Management Practices
Opportunity type:
Source: SWLRI
Source of fund: MoWR
Original source:
Implementing agency: MoWR
Status:
Description
Prepare Preliminary and Detailed design and Tender Documents (including conductall required field surveys) to serve the Construction for all infrastructures proposed in SWLRI.
