PROJECT

Falluijah-Amreah & (Small farms from the Ramadi-Falujah boundary up to the Baghdad muhafadha boundary)

PROJECT CODE IP-005

Long43.78º Lat33.27º

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year: 2025

Reclamation end year: 2029

ZIs OpportunityVIs EmergencyVIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $265,974,417
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD): $1,695,753
REH off border drainage (USD):
RECL off border drainage (USD): $848,831
REH off farm irrigation (USD):
RECL off farm irrigation (USD): $92,026,022
REH off farm drainage (USD):
RECL off farm drainage (USD): $58,369,426
REH off farm other (USD):
RECL off farm other (USD): $32,986,881
REH on farm irrigation (USD):
RECL on farm irrigation (USD): $18,110,400
REH on farm drainage (USD):
RECL on farm drainage (USD): $47,242,211
REH on farm other (USD):
RECL on farm other (USD): $14,694,893

Project Cost (USD): $265,974,417

Governorate: Anbar

River: Euphrates

Location: In between of Euphrates River and Fallujah Main Canal, 35 km to the west of Baghdad

Category: Irrigation and Drainage Projects

Sub category: Major Reclamation

Sector: Current and future agriculture developments and productivity;

Type: Land reclamation, implementation/expansion of irrigation projects

Opportunity type: Construction

Source: Water Resources Development Strategies 2010-2014. Page 21

Source of fund: GoI

Original source: AL ANBAR DP 2010-2014. Pages 137-139

Implementing agency: MoWR

Status: Proposed/Planned

Falluijah-Amreah & (Small farms from the Ramadi-Falujah boundary up to the Baghdad muhafadha boundary)

Description

The ‘Falluijah-Amreah (and Small farms from the Ramadi-Falujah boundary up to the Baghdad muhafadha boundary)’ irrigation project (IP) is located in Anbar Governorate, in the Euphrates River Basin.According to the Ministry of Water Resources, SWLRI Division, and after the meetings during December 2013 to February 2014, the project is ‘Planned’ to be developed over a total command or gross area of about 56 thousand Du (14 th. Ha), corresponding to a net area of 49.1 th. Du. The suggested source of irrigation water is the Euphrates River.About 52 th. Du are currently cultivated (92% of the total area to be implemented).

Needs

Irrigation and drainage infrastructure has to be build. Leaching is needed to get rid of the accumulation of salts on the soil, caused by poor drainage and inefficient on-farm irrigation methods. The water table is shallow and subsurface drains are needed. Efficient on-farm irrigation methods, suitable crop rotation system, good quality seeds and fertilizers, and technical assistance are crucial to achieve high quality and quantity production.

Objective

The objective is to achieve food self sufficiency and security and reduce poverty by reclaiming an additional area of 56 th.Du.

Screening

Performed under SWLRI phase 2

Beneficiaries

Execute reclamation projects will improve social conditions of lands users by improving soil quality and increase productivity.