PROJECT

Suq Al- Shuyukh

PROJECT CODE IP-030

Long46.39º Lat30.95º

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year: 2030

Reclamation end year: 2032

ZIs OpportunityVIs EmergencyVIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $364,459,091
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD): $2,002,137
REH off border drainage (USD):
RECL off border drainage (USD): $1,021,304
REH off farm irrigation (USD):
RECL off farm irrigation (USD): $123,249,136
REH off farm drainage (USD):
RECL off farm drainage (USD): $78,173,338
REH off farm other (USD):
RECL off farm other (USD): $44,178,859
REH on farm irrigation (USD):
RECL on farm irrigation (USD): $24,255,000
REH on farm drainage (USD):
RECL on farm drainage (USD): $71,898,657
REH on farm other (USD):
RECL on farm other (USD): $19,680,661

Project Cost (USD): $364,459,091

Governorate: Thi-Qar

River: Euphrates

Location: South of Nasiriya City to the north of Suq Al-Shuyukh City

Category: Irrigation and Drainage Projects

Sub category: Major Reclamation

Sector: Current and future agriculture developments and productivity;

Type: Land reclamation, implementation/expansion of irrigation projects

Opportunity type: Construction

Source: Water Resources Development Strategies 2010-2014. Page 21

Source of fund: GoI

Original source: MoWR

Implementing agency: MoWR

Status: Proposed/Planned

Suq Al- Shuyukh

Description

The ‘Suq Al- Shuyukh’ irrigation project (IP) is located in Thi-Qar Governorate, in the Euphrates River Basin.According to the Ministry of Water Resources, SWLRI Division, and after the meetings during December 2013 to February 2014, the project is ‘Planned’ to be developed over a total command or gross area of about 75 thousand Du (18.75 th. Ha), corresponding to a net area of 65.8 th. Du. The suggested source of irrigation water is the Euphrates River.About 25 th. Du are currently cultivated (34% of the total area to be implemented).

Needs

Irrigation and drainage infrastructure has to be build. Leaching is needed to get rid of the accumulation of salts on the soil, caused by poor drainage and inefficient on-farm irrigation methods. The water table is shallow and subsurface drains are needed. Efficient on-farm irrigation methods, suitable crop rotation system, good quality seeds and fertilizers, and technical assistance are crucial to achieve high quality and quantity production.

Objective

The objective is to achieve food self sufficiency and security and reduce poverty by reclaiming an additional area of 75 th.Du.

Screening

Performed under SWLRI phase 2

Beneficiaries

Execute reclamation projects will improve social conditions of lands users by improving soil quality and increase productivity.