PROJECT
Haruniyay+ Combined head reach (sudour)+ Muqdadiyah
PROJECT CODE IP-092
Long44.96º Lat33.95º
Start:
Duration:
Rehabilitation start year: 2017
Rehabilitation end year: 2021
Reclamation start year: 2022
Reclamation end year: 2024
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $282,675,841
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD): $231,000
REH off border drainage (USD): $471,927
RECL off border drainage (USD):
REH off farm irrigation (USD): $88,803,269
RECL off farm irrigation (USD): $10,652,994
REH off farm drainage (USD): $15,038,383
RECL off farm drainage (USD): $25,063,971
REH off farm other (USD): $13,002,819
RECL off farm other (USD): $31,059,910
REH on farm irrigation (USD): $27,489,000
RECL on farm irrigation (USD): $2,587,200
REH on farm drainage (USD): $40,742,572
RECL on farm drainage (USD): $3,834,595
REH on farm other (USD): $21,659,644
RECL on farm other (USD): $2,038,555
Project Cost (USD): $282,675,841
Governorate: Diyala
River: Diyala
Location: In between of Diyala River and Combined Canal
Category: Irrigation and Drainage Projects
Sub category: Major Reclamation
Sector: Current and future agriculture developments and productivity;
Type: Land reclamation, implementation/expansion of irrigation projects
Opportunity type: Operation & Mantainance
Source: Water Resources Development Strategies 2010-2014. Page 21
Source of fund: GoI
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
The ‘Haruniyay+ Combined head reach (sudour)+ Muqdadiyah’ irrigation project (IP) is located in Diyala Governorate, in the Tigris River Basin.According to the Ministry of Water Resources, SWLRI Division, and after the meetings during December 2013 to February 2014, the project is ‘Partially Developed’ over an area of 85 thousand Du out of a total command or gross area of about 93 thousand Du (23.25 th. Ha), corresponding to a net area of 81.6 th. Du. The source of irrigation water is the Diyala River.About 93 th. Du are currently cultivated (100% of the total area to be implemented).
Needs
The existing canals need to be rehabilitated and lined. Leaching is needed to get rid of the accumulation of salts on the soil, caused by poor drainage and inefficient on-farm irrigation methods. The water table is shallow and subsurface drains are needed. Efficient on-farm irrigation methods, suitable crop rotation system, good quality seeds and fertilizers, and technical assistance are crucial to achieve high quality and quantity production.
Objective
The objective is to achieve food self sufficiency and security and reduce poverty by improving efficiency and productivity over an area of 93 th.Du .
Screening
Performed under SWLRI phase 2
Beneficiaries
Execute reclamation projects will improve social conditions of lands users by improving soil quality and increase productivity.