PROJECT

East Euphrates Drain

PROJECT CODE DR-001

Longº Latº

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $20,931,996
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $20,931,996

Governorate: IRAQ

River: Euphrates

Location: South Iraq

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Operation & Mantainance

Source: Water Resources Development Strategies 2010-2014. Page 27.

Source of fund: MoWR

Original source: NDS 2010-2014, pg 108

Implementing agency: MoWR

Status: Partially Developed

East Euphrates Drain

Description

Reduce the salinity level in the Euphrates River. The Euphrates East Drain will collect drainage water in a separate channel system for ultimate discharge into the MOD. Length of Zone 3 is approximately 60.8 km; length of Zone 4 is approximately 14 km. Eastern Euphrates drain is considered one of the biggest collecters of Euphrates & Tigris main outfall drain. Eastern Euphrates drain is starting near from Al Kefal city and it is connected to Euphrates & Tigris main outfall drain at the kilometer 188,982 near Al Nasiriya in order to drain ultimately in Arab Gulf. The length of this drain is about 216 Km starting from the drainage outfall of Hilla- Kifil, ending to its outfall in the main river mouth of Tigris & Euphrates. Total area served by this project is about 1,549,240 du distributed to the projects located to the left of Euphrates River, the majority of its drainage water which flows into Euphrates river increases the salinity of area located to the south of Al Kifil city up to Al Nasiriya city. The maximum discharge of eastern Euphrates drain was 85 m3/s in July (according to a report in 2006). The primary length of Euphrates eastern drain flows along the part of Al Kifil main drain for about 93,100KM, and then along Al Shamiya eastern drain for about 92,822KM ,in this way the above two drains constitute Al Kifal main drain & Al Shamiya eastern drain . Both of these drains used for draining the water of Hilla-Kifil project& Hilla –Diwaniyah project & Diwaniyah-Shafi’iyah& part of Kifil-Shnafiyah project.

Needs

At present, drainage water from numerous irrigation projects is discharged back into the adjacent rivers, increasing their salinity. As river flows become more saline, they are less useful as source waters for irrigation and potable water supply.

Objective

Reduce the salinity level in the Euphrates River. This project aims to remove drainage salts from irrigation networks which is located within the seven projects which are limited between Euphrates River and Shatt Al Hilla, these projects include the following: Hilla-Kifil, Hilla–Diwaniyah, Kifil-Shnafiyah, Diwaniyah-Shafi’iyah, Rumaitha, Shnafiyah-Nasiriya and Muthanna projects.

Screening

Beneficiaries