PROJECT

East Tigris Drain Network – Central Part

PROJECT CODE DR-002

Longº Latº

Start: 2016

Duration: 4

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $42,526,115
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $42,526,115

Governorate: IRAQ

River: Tigris

Location: South Iraq

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Design

Source: Water Resources Development Strategies 2010-2014. Page 28.

Source of fund: MoWR

Original source: NDS 2010-2014, pg 107

Implementing agency: MoWR

Status: Proposed/Planned

East Tigris Drain Network - Central Part

Description

East Tigris Drain is proposed to serve the agricultural areas that fall to the east of the Tigris River in Diyala and Baghdad Governorates. The central part of the drain network will serve the agricultural lands within the following projects: Upper and Lower Khalis Projects (total net area 446,000du), Haruniyay, The Combined head reach (Sudour) + Muqdadiyah, Mahrut, Ruz and Sareah+Tel Asmar projects (total area of 644,000du), in addition to Wihda and Nehrawan projects (total area 196,000 du), Suwairah (134,000du) and Middle Tigris project (160,000du). The proposed drainage plan suggested that this part of the drain will discharge the drainage water to Al-Aziziya Depression. (Note: the project is in the planning and design stage – funds allocated for studies and designs are included under the plan of the General Directorate for Engineering Designs).

Needs

At present, drainage water from numerous irrigation projects is discharged back into the adjacent rivers (Diyala and Tigris Rivers), reduce their water quality. As river flows become more saline, they are less useful as source waters for irrigation and potable water supply.

Objective

Reduce the salinity level in the Tigris River. This project aims to divert the drainage water generated from the projects that are located to east of Tigris River to the proposed Aziziya evaporation lake.

Screening

Beneficiaries