PROJECT
Section 2 of the EED Network
PROJECT CODE DR-018
Longº Latº
Start:
Duration:
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $465,155
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $465,155
Governorate: BABIL
River: Euphrates
Location: Zone 1 – part of the East Euphrates Drain Network
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Operation & Mantainance
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Developed
Description
This section serves the Hilla – Diwania Irrigation Projects. The estimated peak discharges 0.8 m^3/s for section HD1 (discharge at km 261 (Right) of the EED), 14.1 m^3/s for section HD2 (discharge at km 226 (left) of the EED). The EED discharge into the MOD at km 189 (right side).
Needs
Operation and Maintenance, Reuse of Drainage Water.
Objective
Improve O&M, Water Saving