PROJECT
Section 2 of the ETD
PROJECT CODE DR-031
Longº Latº
Start: 2016
Duration: 4
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $203,087
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $203,087
Governorate: Center Iraq
River: Tigris
Location: ZONE 2: East Tigris Drainage Network
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Design
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Under Study
Description
This section is serving Khalis (Upper and Lower) Irrigation Projects. The drain is completed and discharges to Dyiala and Tigris Rivers. The peak discharge is 30 m^3/s and it is proposed to disposed it in the Aziziya Lake.
Needs
The MoWR is proposing for this project to discharges to proposed Aziziya evaporation lake.
Objective
Design