PROJECT

Section 5 of the ETD

PROJECT CODE DR-034

Longº Latº

Start: 2016

Duration: 4

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $203,087
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $203,087

Governorate: Center Iraq

River: Tigris

Location: ZONE 2: East Tigris Drainage Network

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Design

Source: MoWR

Source of fund: MoWR

Original source: NDS 2010-2014, pg 108

Implementing agency: MoWR

Status: Under Study

Section 5 of the ETD

Description

This section is serving 9th April Project (Nehrwan) “Previously 7th of April”, Small farms on left bank of the Diyala and Tigris river south of Baghdad and Al-Wehdah (Nehrwan) Irrigation Projects. This section is currently discharges to Tigris by pumping. The peak discharge is 6 m^3/s.

Needs

The MoWR is proposing for this project to discharges to proposed Aziziya evaporation lake.

Objective

Design

Screening

Beneficiaries