PROJECT
Section 7 of the EED Network
PROJECT CODE DR-042
Longº Latº
Start:
Duration:
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $465,156
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $465,156
Governorate: MUTHANNA
River: Euphrates
Location: Zone 1 – part of the East Euphrates Drain Network
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Operation & Mantainance
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Developed
Description
This section serves the Muthanna Irrigation Projects. The estimated peak discharges 2.3 m^3/s by Pumping (discharging at km 76 of EED). The EED discharge into the MOD at km 189 (right side).
Needs
Operation and Maintenance, Reuse of Drainage Water.
Objective
Improve O&M, Water Saving
