PROJECT
Dokan
PROJECT CODE DAM-005
Long44.95º Lat35.95º
Start: 2015
Duration: 5
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $25,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $25,000,000
Governorate: SULAYMANIYAH
River: Lesser zab
Location:
Category: Dams
Sub category: Multy Purpose Dam
Sector: Hydro electricity;
Type: Electricity
Opportunity type: Operation & Mantainance
Source: PMO
Source of fund: MoWR
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
The dam is located in Sulaymaniya Governorate, in Kurdustan Region at about 300 km north of Baghdad , 60 km north west of Sulaymaniya town , 220 km upstream the confluence of Lesser Zab river into Tigris River . The dam is constructed across lesser Zab river a tributary of Tigris River. The dam has a cylindrical shape with inside radius of 120 m ( from the Downstream Face ) the dam crest total length is 360 m. with maximum height of 116 m. The dam is a concrete arch dam , it was built within the period from 1954 – 1959 and commissioned in 1960
Needs
The following repair and maintenance works are required for the instrumentation at Dokan dam site ; Replacement of the three Observation wells D, E , and F outside the Dam.Cleaning and maintaining other 14 observation wells. Replacement of the Upstream Water Levels Recorder (rittmeyer) with more sophisticated one. Improvement of the seepage collection system inside the tunnels, by using proper piping network. Improvement (reconstruction) of the passage and the stairs leading to the seepage measurement pools and V notch Weirs. Replacement of three pools and V notch. Replacement of the river gauging station at the downstream side of the dam.
Objective
The dam was constructed for the following Objectives: Flood control of lesser Zab river and offer safety for the downstream areas and Tigris river . Storage Of water for Irrigation (serving an area of 37500 ha ) . Electrical power generation of 400 Mw. Development Of Tourists Projects. Development of Aquatic Life in the reservoir .
Screening
yes