PROJECT

Mandawa

PROJECT CODE DAM-014

Long43.92º Lat36.53º

Start: 2035

Duration: 5.5

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyVIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $1,763,900
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $1,763,900

Governorate: ERBIL

River: Greater Zab

Location:

Category: Dams

Sub category: Multy Purpose Dam

Sector: Hydro electricity;

Type: Electricity

Opportunity type: Study

Source: PMO

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Under Study

Mandawa

Description

Construction of Mandawa reregulation dam for purposes: Irrigation, power installation, floor control. This dam will provide to the Northern irrigation systems. The dam is located on the upper zab river 44 km downstream of Bakhma dam. This also includes construction a hydropower plant. Dam= Earth & rock fill dam, height = 88 m.

Needs

Mindawa Dam would provide several benefits including significant installed hydropower capacity, flood control through regulation of the Greater Zab River, and water supply for irrigation and municipal and industrial uses

Objective

Dam could contribute to provide storage for irrigation and additionally to cover up to hydropower energy demand.

Screening

yes

Beneficiaries