PROJECT
Dola
PROJECT CODE DAM-068
Long44.78º Lat37.08º
Start: 2035
Duration: 4.5
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $60,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $60,000,000
Governorate: DOHUK
River: Khabur
Location:
Category: Dams
Sub category: HydroPower Dam
Sector: Hydro electricity;
Type: Electricity
Opportunity type: Study
Source: PMO
Source of fund:
Original source: MoInd
Implementing agency: MoEl
Status: Proposed/Planned
Description
Kolos Dam on Al Chafaff River which is a branch of Serwan River in Suliamaniyah. This area is subject to underlying formation noted for seepage problems. Construction of Kolos Earth fill Dam for purposes of irrigation of 8038 hac. Max level storage 710.4 m. Minimum 679.2. Top of dam is 712 m. Height 72 m, length 470 m. Capacity 78 million cubic meters. It only rains 6 months a year, so you have to store the water for the 6 months it’s dry. No Hydrological or geological investigations have been made at this dam at this time.
Needs
Objective
Screening
no
