PROJECT

Dola

PROJECT CODE DAM-068

Long44.78º Lat37.08º

Start: 2035

Duration: 4.5

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyVIs ApportenantVIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $60,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $60,000,000

Governorate: DOHUK

River: Khabur

Location:

Category: Dams

Sub category: HydroPower Dam

Sector: Hydro electricity;

Type: Electricity

Opportunity type: Study

Source: PMO

Source of fund:

Original source: MoInd

Implementing agency: MoEl

Status: Proposed/Planned

Dola

Description

Kolos Dam on Al Chafaff River which is a branch of Serwan River in Suliamaniyah. This area is subject to underlying formation noted for seepage problems. Construction of Kolos Earth fill Dam for purposes of irrigation of 8038 hac. Max level storage 710.4 m. Minimum 679.2. Top of dam is 712 m. Height 72 m, length 470 m. Capacity 78 million cubic meters. It only rains 6 months a year, so you have to store the water for the 6 months it’s dry. No Hydrological or geological investigations have been made at this dam at this time.

Needs

Objective

Screening

no

Beneficiaries