PROJECT
Shatt Al Kahlaa
PROJECT CODE REG-005
Long47.17º Lat31.85º
Start: 2015
Duration: 2
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $1,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $1,000,000
Governorate: MISSAN
River: Tigris
Location: Missan
Category: Regulators
Sub category: Regulator
Sector: Environmentally sensitive areas including the unique Mesopotamian marshes;
Type: Polution & Environmental Protection
Opportunity type: Operation & Mantainance
Source: SWLRI
Source of fund: MoWR
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
Needs
Detailed Inspection and Evaluation for all the Structure’s parts and gates by qualified consultants is required. In order to define the required maintenance and /or replacement and any other improvement works. A new bathymetry survey is required for the River reaches upstream and downstream the Regulator to evaluate the sediment accumulation within the upstream reach and the scour if any within the downstream reach, this will define the required dredging, cleaning and/ or protection works
Objective
Kahlaa Head Regulator was constructed to control Kahlaa river flow and to regulate the irrigation water distribution for the parts of Amara Irrigation project commanded by Kahlaa river, it is an important water control structure in the Country’s Water Resources Management system
