PROJECT

Hilla

PROJECT CODE REG-010

Long44.27º Lat32.73º

Start: 2015

Duration: 1

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $150,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $150,000

Governorate: BABIL

River: Euph/Shatt Al Hilla

Location: Babil

Category: Regulators

Sub category: Regulator

Sector: Current and future water allocation for each irrigation project;

Type: Irrigation and Drainage

Opportunity type: Operation & Mantainance

Source: SWLRI

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Hilla

Description

Needs

The structure is in a very good condition and no operational and Maintenance Issues were presented by the Project office. A new bathymetry survey is required for the upstream river reaches and for the downstream sections of Shatt Al Hilla to evaluate the sediment accumulation within the upstream reaches of the regulator and Navigation Lock and the sedimentation and/or scour if any within the downstream reaches , in order to define any required dredging , cleaning and/ or protection works.

Objective

The Regulator was constructed to control the flow entering Shatt al Hilla from Euphrates River upstream New Hindiya Barrage to irrigate 420000 ha of Hilla Diwaniya Project also to facilitate the navigation for small boats between shatt al Hilla ( Hilla Canal) .

Screening

Beneficiaries