PROJECT

ABBASIYAH

PROJECT CODE BAR-012

Long44.38º Lat32.14º

Start: 2015

Duration: 3

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $10,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $10,000,000

Governorate: NAJAF

River: Euphrates

Location:

Category: Barrages

Sub category: Barrage

Sector: Current and future water allocation for each irrigation project;

Type: Mantainance

Opportunity type: Operation & Mantainance

Source: MoWR

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Developed

ABBASIYAH

Description

The Abbasiya barrage is located on, Shamiya Branch of the Euphrates River upstream the town of Shamiya within Najaf Governorate, to serve part of Kifil Shanafiya Irrigation Project which is not constructed yet. It is now providing the irrigation water to all cultivated areas located upstream the barrage. The Barrage construction is started in 1986 and completed by the end of 1988. The barrage is a modern concrete structure it is composed of 6 openings controlled by radial gates each (12 m X 6.30 m) able to pass a total discharge of 1100 m3/s , the max pond level upstream the barrage is 25.70 masl . The scheme includes a fish ladder to facilitate the fish migration across the barrage. Also two future intakes on each bank for the Future Kifil Shanafiya Project

Needs

The following issues ere found very important: INSPECTION AND EVALUATION: Detailed Inspection and Evaluation for all the Structures by qualified consultants are required, In order to define the required maintenance and /or replacement and improvement works. OPERATION AND MAINTENANCE MANUAL: A qualified consultant must be employed to prepare the required monitoring instrumentation and Piezometers to be installed at each structure, and preparation of New Operation and Maintenance Manual.

Objective

The scheme was constructed to control the flow and water levels in Shamiya Branch of Euphrates River and diverting and regulating part the River water by gravity for irrigation for the cultivation areas located on both sides of the river upstream the Barr

Screening

Beneficiaries