PROJECT
Central Area Main Drain Section-6
PROJECT CODE DR-011
Longº Latº
Start:
Duration:
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $1,720,625
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $1,720,625
Governorate: BABIL
River: Euphrates
Location: ZONE 1: Central Area Main Drain
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Operation & Mantainance
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Developed
Description
Central area main drains is located between the Tigris and Euphrates Rivers. The Main Out fall Drain (MOD) Extends from north of Baghdad to south of Basrah, (total length 565km), collecting the drainage water of Great Mussaiyab Irrigation Project. The estimated peak discharge is 15 m^3/s
Needs
According to the MoWR the Drain is completed and there is no need for changing the system. Operation and Maintenance are required. Opportunity to treat and re-use drainage water should be considered
Objective
O&M, Re-use of Drainage Water