PROJECT

Dohuk

PROJECT CODE DAM-002

Long43.00º Lat36.88º

Start: 2015

Duration: 5

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyVIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $5,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $5,000,000

Governorate: DOHUK

River: Robar

Location:

Category: Dams

Sub category: Multy Purpose Dam

Sector: Hydro electricity;

Type: Electricity

Opportunity type: Operation & Mantainance

Source: PMO

Source of fund: MoWR

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Dohuk

Description

The dam is located in Duhok Governorate on Rubar Duhok river at 2 km north Duhok town. it is a high earth fill dam with central clay core and gravel shell , the maximum height of the dam above the river bed is 60.50 m , the total earthworks volume used in the construction is about 3 million cubic meters , at the spillway crest level of 615.75 masl the reservoir volume is 52 million cubic meters , out of this 4.39 million cubic meters is the dead storage at elevation 584.00 masl . the dam was completed and commissioned in 1988.

Needs

Generally The dam is in very good condition . no any issue is to be considered apart from the routine annual inspection and maintenance.The following requirements are needed; Digital metrological station is required to be installed at the dam site . Dam safety instrumentation are needed to be installed water levels measuring devices are needed to be installed web cams are needed to be installed foe security. Sounding device for the piezometer water levels measurements is needed. Flow meter for discharge measurement is needed. water quality testing device is needed.

Objective

The dam was constructed as a multipurpose project for the following Objectives: Storage Of Water for downstream Irrigation demands for 4600 ha of orchards located along Mosul Zakho main road, and other uses. Development of Tourist facilities and Fisheries with positive impact on environment

Screening

yes

Beneficiaries