PROJECT
East Tigris Drain Network – Southern Part
PROJECT CODE DR-003
Longº Latº
Start: 2016
Duration: 4
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $160,560,861
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $160,560,861
Governorate: IRAQ
River: Tigris
Location: South Iraq
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Design
Source: Water Resources Development Strategies 2010-2014. Page 28.
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Proposed/Planned
Description
East Tigris Drain is proposed to serve the agricultural areas that fall to the east of the Tigris River in Wasit, Missan and Basrah Governorates. The Southern part of the drain network will serve the agricultural lands within following projects: Badra-Jassan and Daboni Projects (total area 114,000du), Sector 9 of Kut-Butaira project (8,000du), Nahar-Saad project (75,000du), the left side of Amara project (280,000du), in addition to the left side of Shatt Al-Arab project (110,000du). The proposed drainage plan suggested that this part of the drain will discharge the drainage water to Shatt Al-Arab to the south of Basrah city. (Note: the project is in the planning and design stage – funds allocated for studies and designs are included under the plan of the General Directorate for Engineering Designs)
Needs
At present, drainage water from numerous irrigation projects is discharged into the adjacent marshes. Gathering the drainage water into one drain and control their disposals improve the management of the irrigation network of the served projects.
Objective
This project aims to remove drainage salts from irrigation networks which are located to the east of the Tigris River within the projects which are limited between Badra –Jassan and Shatt Al-Arab irrigation projects, these projects include the following: Badra-Jassan, part of Kut-Butaira, Nahar-Saad, part of Amara and part of Shatt Al-Arab projects.