PROJECT
Hemrin
PROJECT CODE DAM-003
Long44.97º Lat34.11º
Start: 2015
Duration: 5
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $10,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $10,000,000
Governorate: DIYALA
River: Diyala
Location:
Category: Dams
Sub category: Multy Purpose Dam
Sector: Hydro electricity;
Type: Electricity
Opportunity type: Operation & Mantainance
Source: PMO
Source of fund: MoWR
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
The Dam is located in Diyala Governorate, constructed on Diyala river 10 km upstream of Diyala weir, 120 km north east of Baghdad Downstream Derbendikhan dam. It is an embankment dam with central inclined clay core, 3500 m long with maximum height 53 m with crest at Elev . 109.50 masl , the dam includes a central clay core and U/S and D/S filters , the upstream slope is covered by precast concrete blocks to protect the dam from waves action from the reservoir side and D/S slopes covered by coarse gravel to protect the slope from erosion caused by rain water. The Earth fill quantities was about 3 560 000 cum 73% clayey materials and 27% the upstream and downstream covers, in addition 110 000 cum precast concrete blocks were placed at the upstream slope . the dam construction is started in 1976 and completed and commissioned in 1981.
Needs
Nothing is needed apart from the routine annual maintenance and the continues observation of the monitoring instrumentations
Objective
Hemren dam is one of the strategic projects within Diyala river Basin, it was found necessary to control river’s floods. The dam was constructed for the following objectives Control of Diyala river floods from 14000cum/s to 4000 cum/s. Storage of water for irrigation of 300 000 ha within Diyala basin downstream the dam. Electrical power generation of 215 KW/hr. Development of tourists projects. Development of aquatic life ( fisheries .. etc )
Screening
yes