PROJECT
Hilla
PROJECT CODE REG-010
Long44.27º Lat32.73º
Start: 2015
Duration: 1
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $150,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $150,000
Governorate: BABIL
River: Euph/Shatt Al Hilla
Location: Babil
Category: Regulators
Sub category: Regulator
Sector: Current and future water allocation for each irrigation project;
Type: Irrigation and Drainage
Opportunity type: Operation & Mantainance
Source: SWLRI
Source of fund:
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
Needs
The structure is in a very good condition and no operational and Maintenance Issues were presented by the Project office. A new bathymetry survey is required for the upstream river reaches and for the downstream sections of Shatt Al Hilla to evaluate the sediment accumulation within the upstream reaches of the regulator and Navigation Lock and the sedimentation and/or scour if any within the downstream reaches , in order to define any required dredging , cleaning and/ or protection works.
Objective
The Regulator was constructed to control the flow entering Shatt al Hilla from Euphrates River upstream New Hindiya Barrage to irrigate 420000 ha of Hilla Diwaniya Project also to facilitate the navigation for small boats between shatt al Hilla ( Hilla Canal) .
