PROJECT
HUSAINAIA
PROJECT CODE REG-012
Long45.63º Lat32.52º
Start: 2015
Duration: 1
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $150,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $150,000
Governorate: WASIT
River: Tigris
Location: US Kut
Category: Regulators
Sub category: Regulator
Sector: Current and future water allocation for each irrigation project;
Type: Irrigation and Drainage
Opportunity type: Operation & Mantainance
Source: SWLRI
Source of fund:
Original source: MoWR
Implementing agency: MoWR
Status: Developed
Description
Needs
The structure is in a very good condition and no operational and Maintenance Issues were presented by the Project office. in any case it shall be Inspected along within the new Hindiya Barrage Scheme, in order to define any required maintenance and /or replacement and improvement works . Along with the preparation of a new operation and Maintenance Manual
Objective
The regulator was constructed within Hindiya barrage scheme to control and regulate the flow from Euphrates River water into Al- Hussayeniah canal which irrigates 25000 ha on the right side of the river.
