PROJECT

Makhmur

PROJECT CODE IP-057

Long43.65º Lat35.68º

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyVIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $576,253,583
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD): $230,065,055
REH off farm drainage (USD):
RECL off farm drainage (USD): $145,923,564
REH off farm other (USD):
RECL off farm other (USD): $82,467,203
REH on farm irrigation (USD):
RECL on farm irrigation (USD): $67,105,500
REH on farm drainage (USD):
RECL on farm drainage (USD): $18,789,516
REH on farm other (USD):
RECL on farm other (USD): $31,902,745

Project Cost (USD): $576,253,583

Governorate: Ninawa-Kirkuk

River: Greater Zab

Location: On the left bank of Tigris River and bounded from the north by Greater Zab River and from the south by Lesser Zab River in Ninawa and Erbil Governorates

Category: Irrigation and Drainage Projects

Sub category: Major Reclamation

Sector: Current and future agriculture developments and productivity;

Type: Land reclamation, implementation/expansion of irrigation projects

Opportunity type: Construction

Source: Water Resources Development Strategies 2010-2014. Page 21

Source of fund: GoI

Original source: MoWR

Implementing agency: MoWR

Status: Proposed/Planned

Makhmur

Description

The ‘Makhmur’ irrigation project (IP) is located in Erbil Governorate, in the Tigris River Basin.According to the Ministry of Water Resources, SWLRI Division, and after the meetings during December 2013 to February 2014, the project is ‘Planned’ to be developed over a total command or gross area of about 140 thousand Du (35 th. Ha), corresponding to a net area of 122.8 th. Du. The suggested source of irrigation water is the Basin River.About 0 th. Du are currently cultivated (0% of the total area to be implemented).

Needs

Irrigation and drainage infrastructure has to be build. Leaching is needed to get rid of the accumulation of salts on the soil, caused by poor drainage and inefficient on-farm irrigation methods. The water table is shallow and subsurface drains are needed. Efficient on-farm irrigation methods, suitable crop rotation system, good quality seeds and fertilizers, and technical assistance are crucial to achieve high quality and quantity production.

Objective

The objective is to achieve food self sufficiency and security and reduce poverty by reclaiming an additional area of 140 th.Du.

Screening

Performed under SWLRI phase 2

Beneficiaries

Execute reclamation projects will improve social conditions of lands users by improving soil quality and increase productivity.