PROJECT
Section 3 of the EED Network
PROJECT CODE DR-019
Longº Latº
Start:
Duration:
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $465,155
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $465,155
Governorate: South Iraq
River: Euphrates
Location: Zone 1 – part of the East Euphrates Drain Network in Najaf and Diwaniyah Governorates
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Operation & Mantainance
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Developed
Description
This section serves part of Kifil-Shannafyah Irrigation Projects. The estimated peak discharges 18.8 m^3/s for the 1.3 MD section (discharging at km 237 to the right into EED; an amount equal to 16.7 m3/sec is pumped from this drain to Hor Ibn Najem lake, which acts as balance basin by evaporation to reduce the peak discharge of EED), 5 m^3/s for section 1.1 MD (discahring at km 184 to the right of the EED), 3.6 m^3/s for a number of small drains discharging at different location on the right of the EED and 30 m^3/s for Shamia West Drain (discharing at km 163 to the right of the EED). The EED discharge into the MOD at km 189 (right side).
Needs
Operation and Maintenance, Reuse of Drainage Water.
Objective
Improve O&M, Water Saving