PROJECT

Section 5 of the EED Network

PROJECT CODE DR-021

Longº Latº

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $465,155
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $465,155

Governorate: MUTHANNA

River: Euphrates

Location: Zone 1 – part of the East Euphrates Drain Network

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Operation & Mantainance

Source: MoWR

Source of fund: MoWR

Original source: NDS 2010-2014, pg 108

Implementing agency: MoWR

Status: Developed

Section 5 of the EED Network

Description

This section serves the Rumaitha Irrigation Projects. The estimated peak discharges 3.2 m^3/s for section R-1 (discharging at km 102 of EED to the left), 2.8 m^3/s for section R-2 (discharging at km 95 of EED to the left) and 2.3 m^3/s by pumping for section R-3 (discharging at km 77 of EED to the left). The EED discharge into the MOD at km 189 (right side).

Needs

Operation and Maintenance, Reuse of Drainage Water.

Objective

Improve O&M, Water Saving

Screening

Beneficiaries