PROJECT
Section 5 of the ETD
PROJECT CODE DR-034
Longº Latº
Start: 2016
Duration: 4
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $203,087
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $203,087
Governorate: Center Iraq
River: Tigris
Location: ZONE 2: East Tigris Drainage Network
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Design
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 108
Implementing agency: MoWR
Status: Under Study
Description
This section is serving 9th April Project (Nehrwan) “Previously 7th of April”, Small farms on left bank of the Diyala and Tigris river south of Baghdad and Al-Wehdah (Nehrwan) Irrigation Projects. This section is currently discharges to Tigris by pumping. The peak discharge is 6 m^3/s.
Needs
The MoWR is proposing for this project to discharges to proposed Aziziya evaporation lake.
Objective
Design