PROJECT
Shat Basrah
PROJECT CODE REG-007
Long47.78º Lat30.41º
Start: 2015
Duration: 3
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $200,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $200,000,000
Governorate: BASRAH
River: Shatt Basrah
Location: Basrah
Category: Regulators
Sub category: Regulator
Sector: Navigation and water transport;
Type: Infrastructures
Opportunity type: Operation & Mantainance
Source: PMO
Source of fund:
Original source: MoWR
Implementing agency: MoWR
Status: Under Construction
Description
Needs
the structure is completely damaged and out of Service. This was happened during the war (hostilities) of 2003 the structure in its current condition is completely useless. Detailed Inspection and Evaluation for all parts of the Structure, Hydro-mechanical, and Electrical equipment by qualified consultants is required, to decide the feasibility for full rehabilitation. Or constructing a new regulator further upstream and removing the runes of the existing one.
Objective
Originally, Shatt Basrah canal was constructed to join the Hammar Natural Lake (Marsh) with The Khor Al Zubair North of The Arabian Gulf. For the purpose of diverting part of Hammar Lake water during floods directly to the gulf, and not to Shatt al Arab. The other objective was to facilitate the navigation between Umm Qaser Port and the inland rivers, Shatt al Arab, Tigris and Euphrates. In order to stop the salinity intrusion from the sea into the channels and Hammar Lake, Shatt Basrah Regulator Was Constructed At Km 22.00 of the channel to stop the backflow caused by Tidal waves. Later the Main Outfall drains were connected to Shatt Basrah at Km 7.00. This project is considered one of the most important Water resources Management Projects