PROJECT

Tharthar

PROJECT CODE REG-017

Long43.61º Lat33.48º

Start: 2015

Duration: 3

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $50,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $50,000,000

Governorate: SALAH AD DIN

River: Tigris

Location: Tharthar intake

Category: Regulators

Sub category: Head Regulator

Sector: Current and future water allocation for each irrigation project;

Type: Food Security

Opportunity type: Operation & Mantainance

Source: SWLRI

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Tharthar

Description

Needs

Detailed Inspection and Evaluation for all the Structures by qualified consultants is required In order to define the required maintenance and /or replacement and improvement works . Sedimentation surveys of Iraq’s rivers carried out by MoWR indicated considerable amounts of sediments that need to be dredged from the upstream of Samarra Barrage , the estimated amount there is some 56.5 million cubic meters . the extent of Sediment removal should be based on hydraulic model tests . therefore a bathymetry survey is needed upstream and downstream the barrage and Tharthar inlet Regulator. Then a model constructed to test different solutions of river training works and the extent of sediments dredging works .

Objective

The scheme was constructed for the Flood control of Tigris river and offer safety for the downstream areas and the Capital Baghdad , this is done by diverting part of Tigris River water during flood via the constructed flood escape regulator and the flood escape channel to Tharthar lake which originally was a natural depression created by storing the diverted water during flood time since 1956

Screening

Beneficiaries